Tentang Perusahaan

Deskripsi Perusahaan
A Hydropower plants company with many massive projects along Sulawesi and Sumatra Island Indonesia. Our Aim is to provide electricity using friendly resource water. We believe that electric power remains industrial societies and civilization lifelong. The first IPP (Independent Power Producer Procurement Programme) Scheme which was built in 2005 and has produced electricity since 2012 is PT Poso Energy located in Middle Sulawesi.\n \nCurrently we are seeking energetic individuals and with good spirits to come and join one of our Hydropower plants Group Company PT Kerinci Merangin Hidro. The Project is located on the Southwestern slope of the Barisan Mountain Range in Sumatra Island. The location of the project is accessible from Sungai Penuh the Capital of Kerinci District from the Northwest and East Bangko which is on the National highway connecting North and South Sumatra.\n \nInstalled capacity is expected at 350 MW which may be considered as one of the largest Hydropower project in Indonesia. The generated electric power will be supplied to the public in the PLN's (An Indonesian government-owned Electricity Company) system so as to cope with the rapid increasing power demand of the system along the policy of the Government of Indonesia.
Address

Bukaka Industrial Estate Jalan Raya Narogong Bekasi KM 19.5 Cileungi Bogor

Lowongan Kerja Rekomendasi